Greenwich Reach Swing Bridge

Another Bridge project installed by Sh Structures; this project was carried out by the Depford Creek in London. Close to the Cutty Sark and docklands of the Thames, this bridge allows visitors to cross and gain access to apartments, shops and leisure activities and enjoy a stunning view.

Utilising X-Tend CXE 2mm dia wire rope mesh with 60mm Mesh Width, the mesh gives a robust but still almost invisible divide as balustrade.

Wire Rope border cables and Rope holding clamps were predominantly used to secure the perimeter border framework. This allowed the installer unique flexibility when installing the cables and increased security and guiding force at the points of contact with the clamp and cable.

View SH Structures full write up on the project here.